Thanks for logging in.

You can now click/tap WATCH to start the live stream.

Thanks for logging in.

You can now click/tap LISTEN to start the live stream.

Thanks for logging in.

You can now click/tap LATEST NEWS to start the live stream.

LISTEN
Watch
on air now

Create a 3AW account today!

You can now log in once to listen live, watch live, join competitions, enjoy exclusive 3AW content and other benefits.


Joining is free and easy.

You will soon need to register to keep streaming 3AW online. Register an account or skip for now to do it later.

Advertisement
Advertisement
Advertisement

Menindee Lakes milestone

Rural News

Any day now the volume of water in the Menindee Lakes will surpass the threshold that’ll see the Murray Darling Basin Authority able to call on water be released for downstream.

Once the volume of water in the lakes surpasses 640 giga litres, some of it can be released as required downstream to Victoria and South Australia.

The last time this happened was in December 2017.

Rural editor Eddie Summerfield caught up MDBA Executive Director of River Management Andrew Reynolds

Subscribe to the National Rural News podcast: http://bit.ly/RuralNewsPodcast

Rural News
Advertisement